Quality Management
Certificates
Controls
Controls
PRINT CONTROL PHASES
To provide appropriateness of Pigmentlac / goldlac / enamelling / paint / silverlac processes and final product to Quality Plan.
• Drying Temperature Check,
• Wet and Dry Film Weight Check,
• Resistance Check,
• Print Check,
• Sensorial Property Check,
• Final Product Check; (Package Characteristics and Final Check)

TIN PRODUCTION CHECK PHASES
To provide appropriates of tin processes to Quality Plan.
• Scissor Cutting Check,
• Cover Hole Printing Check,
• Cover/Circle/Bottom/Plug Printing Check,
• Tin Assembly Check,
• Seam, Clamp, Inflating and Forma Check,
• Body and Bucket Lap Opening Check,
• Interior and Exterior Silverlac Check,
• Dareks/Liquid Seal Process Check,
• Centring Process Check,
• Bucket Capsule Centring,
• Handle Centring,
• Powder Process Check,
• Bottom and Cover Production Assembly Process Check,
• Impermeability Check,
• Bottom and Cover Clamp Measurement Check.
 

  Copyright © 2011 Akpınar . All Rights Reserved.
It is forbidden to copy, transmit or distribute pictures and materials in our website.